Structural steel repair during a unit outage
Platform supports and beam sections cut out, refabricated and welded back in while the unit was down.
Work grouped the way a project manager scopes it — heavy industrial maintenance, life-safety systems, and commercial build-out. Every job is run from a work package and closed with a signed completion record.

Platform supports and beam sections cut out, refabricated and welded back in while the unit was down.

Corroded process spools replaced, new stainless runs fabricated, fitted and hydro tested before start-up.

Multi-trade crews staffed around the clock on scaffolded tower work with daily documented sign-off.

New wet-system mains, branch lines and heads installed to current spacing across an occupied warehouse.

Panel replaced and reprogrammed, devices swapped floor by floor, then tested and certified with the AHJ.

Cylinders, discharge piping and detection installed and commissioned to protect critical equipment.

Scheduled water-based inspection and testing across a multi-building site with deficiency reporting.

Piping, sprinkler mains, conduit and equipment set, labeled and turned over inspection-ready.

Switchgear terminations, dedicated equipment circuits and life-safety power run and tested.